Supreme HSR22 High Strength Prestressed Concrete Lintel Textured Finish 2400x100x215mm

SKU
HSR22240
£93.32 £77.77
Product Information
  • Supreme HSR22 lintel measures 2400mm (94.49") x 100mm (3.94") x 215mm (8.46"), ideal for robust structural support.
  • Prestressed concrete construction ensures exceptional strength for demanding build requirements.
  • Textured finish improves mortar and plaster adhesion, enhancing stability on site.
  • BSI Kitemarked and UKCA marked, guaranteeing compliance and quality assurance.
  • Compatible with a range of Supreme padstones; lintels (except Extreme Fire Rated) can be cut to size as needed.
Details

The Supreme HSR22 High Strength Prestressed Concrete Lintel offers reliable, heavy-duty support for builders and contractors tackling high load-bearing openings. Designed with a textured finish for better mortar grip, it’s a trusted choice for serious projects requiring superior structural performance. Please note, lintels are supplied as shown, and complementary padstones are sold separately.

Application

This lintel is suited to openings where enhanced load capacity is essential, such as large window and door frames or structural wall supports. Its prestressed concrete design ensures stability and durability in both residential and commercial builds. The textured surface aids bonding with mortar, reducing installation time and improving long-term adhesion on site.

Dimension

  • 2400mm (94.49") x 100mm (3.94") x 215mm (8.46")

Material

  • Prestressed concrete with textured finish

Type

  • Concrete lintel

This product is BSI Kitemarked and UKCA marked, ensuring it meets stringent UK standards for quality and safety. It can be cut to length on site except for Extreme Fire Rated versions, offering flexibility for varied project requirements.

More Information
More Information
Weight 109.400000
Availability Generally available in 5 to 10 working days.
Manufacturer Supreme
Concrete Lintels - Length 2400mm
Concrete Lintels - Width 100mm
Concrete Lintels - Height 215mm
Concrete Lintels - Type High Strength Prestressed
Sap Id HSR22240
Customer Reviews
No reviews yet on this product
Delivery Information

Delivery Information

Delivery availability

We deliver to most mainland UK addresses. Some postcode areas are excluded – please see the full list below.

Delivery charges

Delivery costs vary depending on your location, the products ordered, and the delivery method selected. All delivery charges are calculated clearly at checkout.

Fuel Surcharge

Information on our added Fuel Surcharge can be found at https://condell-ltd.com/fuel-surcharge-notification


Delivery dates

You can request a preferred delivery date at checkout. While we aim to meet this wherever possible, availability may depend on stock levels and third-party delivery schedules. If your chosen date is unavailable, a member of our team will contact you to arrange an alternative.

Delivery method

All deliveries are made kerbside as standard. For health and safety reasons, drivers are unable to carry materials beyond the kerb. If you have specific access requirements, please contact us before placing your order.

Delivery exclusions

We currently do not deliver to the following postcode areas:

AB16, AB21–22, AB30–AB38, AB41–AB56, BT1–BT94, CA2, CA15, CA28, DD1, DD8, DD9, DG1, DG2, DG10–DG14, DG16, FK18–FK20, GY1–GY9, HS1–HS9, IM1–IM9, IV1–IV5, IV7, IV12–IV13, IV21–IV28, IV30–IV36, IV40–IV56, JE1–JE4, KA1, KA4–KA6, KA14–KA15, KA18–KA21, KA27–KA30, KW1–KW3, KW6–KW17, KY6–KY10, KY13–KY16, LL49, LL58–LL62, LL64–LL78, PA17–PA78, PH11, PH19–PH26, PH30–PH33, PH35–PH38, PH40–PH44, PH49–PH50, PO30–PO41, SA68, SA71, ZE1–ZE3

Important delivery terms

  • Shortages must be reported within 48 hours and noted on delivery paperwork
  • All deliveries must be signed for; redelivery charges may apply
  • Deferred deliveries may incur storage charges
  • Collected orders are not subject to delivery charges
  • Returns are subject to a 25% restocking fee (delivery charges excluded)
  • Made-to-measure items are non-refundable
  • Reasonable access to the delivery point must be available; additional charges may apply